notdavidgilmour
Member
Hi Folks,
Working on a dig at the moment where we can only spend a maximum of 1.5hrs physically digging as we are running out of air. I have thought of running a small compressor at the surface with a serious length of hose down to the dig.
Anyone come up with any better ideas?
Thanks in advance...
Working on a dig at the moment where we can only spend a maximum of 1.5hrs physically digging as we are running out of air. I have thought of running a small compressor at the surface with a serious length of hose down to the dig.
Anyone come up with any better ideas?
Thanks in advance...