Goydenman
Well-known member
New pot being being cleared between Goyden and Frog pot.
Dig 1 - Pushed aside river bed material to expose the limestone bed and and edge of the fault then dug down 2m following solid wall on the side of the fault
Dig 2 - Placed scaffold H frame in the entrance and walled up unstable sides
Dig 3 - Removed very large block of limestone blocking the shaft. It is clear this is major fault with now two solid sides and unstable ends
Dig 4 - Opened up hole to view continuation down to 5-6m and what looks like either blocked shaft or possibly narrow passage that goes back under where we are working.
Takes a small stream and cool draft can be felt
We are hoping this helps us discover the cave passages between Frog and Goyden and make that final link.
Will keep you posted
Dig 1 - Pushed aside river bed material to expose the limestone bed and and edge of the fault then dug down 2m following solid wall on the side of the fault
Dig 2 - Placed scaffold H frame in the entrance and walled up unstable sides
Dig 3 - Removed very large block of limestone blocking the shaft. It is clear this is major fault with now two solid sides and unstable ends
Dig 4 - Opened up hole to view continuation down to 5-6m and what looks like either blocked shaft or possibly narrow passage that goes back under where we are working.
Takes a small stream and cool draft can be felt
We are hoping this helps us discover the cave passages between Frog and Goyden and make that final link.
Will keep you posted