Author Topic: Digging!  (Read 64582 times)

Offline whitelackington

  • forum hero
  • *****
  • Posts: 6533
  • Pyrenees Potholer Digger
Re: Digging!
« Reply #200 on: February 12, 2010, 12:05:26 pm »
As far as I know Chris,  :shrug:
 the most recent digging session down Stainsby's (Blackmoor) was Autumn  2009,
 (that I was on) however I am not doing as much digging as I used to.
"Problem is" quite a few other promising dig sites have recently been reactivated,
one of them being Battery Swallet, one of the highest swallet caves on Mendip but not in limestone, yet.
The weather has not been kind to the diggers lately.
Another recently revived dig site is Bone Hole,
 this was reactivated after much conservation work had been completed.
About 20 metres extra passage uncovered over the last year.
Digging is still happening deep in Upper Flood Swallet
but I still can't get into the new stuff as I am to large/inflexable.
Digging occurs every weekend and often mid-week.
Mick

Offline whitelackington

  • forum hero
  • *****
  • Posts: 6533
  • Pyrenees Potholer Digger
Re: Digging!
« Reply #201 on: May 16, 2010, 10:36:06 am »
I agree with Doug,
 take out the Carcass Cave monorail & install it in Elm Street, Shute Shelve Cavern,
then discover The Axbridge Master System.  :thumbsup: