braveduck
Active member
The BPC digging team,based at the GG camp have placed a new plastic tube into Christmas pot and completly rebuilt the entrance to contain the collapsing cliff. This should ensure the stability of Christmas pot entrance for years to come.Mixing concrete in temperatures of 25 degrees was most pleasent.