• Descent 298 publication date

    Our June/July issue will be published on Saturday 8 June

    Now with four extra pages as standard. If you want to receive it as part of your subscription, make sure you sign up or renew by Monday 27 May.

    Click here for more

Wezzit?

snebbit

Active member
Not Witches 2. This water will be meeting water that's flowed through Witches 2 underground though. I think?
 

snebbit

Active member
Correct!
It's usually a static pool.

Here's Wilf Taylor's flowing that day, the closest we fancied getting to the main drain
wilf-taylors-damp.jpg
 

alanw

Well-known member
Bar?

(I haven't even been down it, just read the inventory of abandoned junk)
Most of the entrances to the Gaping Gill system will be rigged at the winch meets: BPC in May and Craven in August. Everyone is most welcome to come and visit. Through trips, e.g. Stream to Bar can be done without the faff of (de)rigging and carrying hundreds of meters of rope up the hill.
 
Top