Author Topic: Buxton Spa Express 29/09/2021 Date correction  (Read 166 times)

Online Mrs Trellis

  • British Jobs for British Shirkers
  • forum hero
  • *****
  • Posts: 1362
  • Daft old bat
Buxton Spa Express 29/09/2021 Date correction
« on: September 06, 2021, 12:37:08 pm »
This train traverses much of the Peak District  including up and down the Hope Valley line, the Dowlow freight line, the New Mills triangle, and the Buxton - Manchester line.

Unfortunately the itinerary doesn't give the time of arrival at Buxton for its three hour stay. I imagine it's something like 1 - 4pm.

https://saphostrains.com/journey/buxton-spa-express

Mods please delete previous post with incorrect date info.
Global Moderator Comment Done
« Last Edit: September 06, 2021, 03:13:16 pm by paul »
Mrs Trellis
Upper Sheeps Bottom
North Wales

Online Mrs Trellis

  • British Jobs for British Shirkers
  • forum hero
  • *****
  • Posts: 1362
  • Daft old bat
Re: Buxton Spa Express 29/09/2021 Date correction
« Reply #1 on: September 06, 2021, 07:26:35 pm »
Thanks Paul. Even Homer nods occasionally.
Mrs Trellis
Upper Sheeps Bottom
North Wales

Online Mrs Trellis

  • British Jobs for British Shirkers
  • forum hero
  • *****
  • Posts: 1362
  • Daft old bat
Re: Buxton Spa Express 29/09/2021 Date correction
« Reply #2 on: Today at 09:18:12 am »
Quick update - there's a website which gives stopping times for all trains including these excursions:- RealTime trains:- https://www.realtimetrains.co.uk/. At the moment they have the Buxton times as arrive 13:24 depart 15:39.

There is another website Rail advent which publishes the complete itinerary including passing times nearer the event:- https://www.railadvent.co.uk/events/buxton-spa-express-hereford-buxton-2
Mrs Trellis
Upper Sheeps Bottom
North Wales

 

Main Menu

Forum Home Help Search
SimplePortal 2.3.5 © 2008-2012, SimplePortal