I have connected all the stations to the corresponding walls. If you dont mind digging out the details it would be useful. Failing that i could email you the file if it makes it easier.
Cheers
Been trying to draw up a survey using tunnel. I have linked the walls to the centreline and still the order of the overlying passages is in the wrong order. How can this be corrected?
The other prob with dumping over the quaryy edge is that certain people may be buried beneath the rubble. Big Jim and co will get to the bottom of Eldon Hole via the back door by this time next week. Mark my words!!!!
This is the way i did it, which more than likely was the long way round.
Exported the Outline from Pocket Topo.
Opened it in AutoCAD Exported it as a large size pdf.
Using acrobat pro saved the pdf as a jpg
imported it in the normal way.