We're currently using scaffolding and shuttering to move (crawl) through an area of breakdown and infill. Whilst discussing how to progress the question was asked, is it better to continue tying in the new scaffolding to the existing scaffolding and one solid wall or should a new cage be created that just buts up or over laps the existing one.
The current shuttered cage is approx 15' long with shuttering and is tied into a wall periodically but also to itself. So is one method safer / stronger?