JB
Member
Another Bagshawe Cavern working day is planned for Saturday 5th April 08 and it would be great to get plenty of cavers along to help. The aim is to complete the casting of the concrete slabs in the roof of the entrance stope to protect the steps from rockfall. We will be mixing concrete on the surface and then using rope or wire tyroleans to transport the concrete to where it's needed in the entrance stope. The concrete will then be poured into the wooden shuttering that's already in place to create the concrete slabs.
Just pop along with caving kit/old warm clothes and decent gloves from 9:00 a.m. If you would like to make a weekend of it bring a sleeping bag and feel free to crash upstairs in the Coe.
Please let us know if you are able to make it. Any questions etc. just get in touch with me or SamT.
Cheers,
Jules.
Just pop along with caving kit/old warm clothes and decent gloves from 9:00 a.m. If you would like to make a weekend of it bring a sleeping bag and feel free to crash upstairs in the Coe.
Please let us know if you are able to make it. Any questions etc. just get in touch with me or SamT.
Cheers,
Jules.