NRW Mine Works

davel

Member
NRW have announced an "intention not to prepare" environmental statements for works as part of the NWR Metal Mines Project - Flow Gauging and Monitoring Structures at the following sites:
  • Castell Mine: installation of a flow monitoring structure (weir box) on a lagoon overflow at SN 77449 81256
  • Glog Fach Mine: installation of a flow monitoring structure (trapezoidal flume) located in close proximity to Western Shaft at SN 74544 70759
  • Level Fawr Adit Portal: installation of a flow monitoring structure located in close proximity to the adit portal within the garden of the Count House SN 73923 72197
  • Nantiago Mine: installation of two flow monitoring structures (data loggers) located at Nantiago Mine Open Stope at SN 82480 86403 and downstream of the Nantiago Mine at SN 82597 85935
  • Nantygwrdy Mine: installation of a flow monitoring structure (v-notch weir) at Nantygwrdy Adit SN 82765 85091
(extracted from NRW notice in Cambrian News dated Wednesday 13 December 2023)

Dave
 
Top