Dan and I had a look at P7 last night.
The entrance shaft has moved a fair bit - there's loose stuff around but the scaff is holding up pretty well.
Climbed down the White Room and checked out the sunps. There was flood debris up to around the base of the shuttering in the White Room (may 5-6m above normal sump level) which had clearly not flowed down the White Room. The "upstream" sump had hardly dropped (maybe 3-4" down?) whilst the downstream sump was cobble-choked and not enterable. There was no significant draught.
It would be interesting to know what the upstream/downstream sumps in P8 are like at the moment/have been like recently to see whether there is any link in levels.
The entrance shaft has moved a fair bit - there's loose stuff around but the scaff is holding up pretty well.
Climbed down the White Room and checked out the sunps. There was flood debris up to around the base of the shuttering in the White Room (may 5-6m above normal sump level) which had clearly not flowed down the White Room. The "upstream" sump had hardly dropped (maybe 3-4" down?) whilst the downstream sump was cobble-choked and not enterable. There was no significant draught.
It would be interesting to know what the upstream/downstream sumps in P8 are like at the moment/have been like recently to see whether there is any link in levels.