JoshW said:i'd go and rig the 20ft pitch in swildons with all 100m, leaving a spaghetti nest of rope sitting at the bottom of the pitch.
that's the way to do it isn't it?
Cap'n Chris said:It's unsuitable for SRT since the bolts give a hang which is into water. Rigging without using the in-situ bolts gives a better SRT route but requires some ingenuity but still gets in the way of people using L&L and the bolts; additional bolting would result in a better roped/SRT route.