« on: July 11, 2020, 02:14:30 pm »
DCA are looking for some assistance with capping a couple of holes up near Eldon Quarry for the farmer. These have already been checked out and an application submitted to Natural England for the capping work. While we are waiting for permission to be granted, it seemed wise to seek volunteers to help. Primarily, it is a concrete mixing and pouring job, with some simple masonry work. No experience other than the ability to wield a shovel is needed, but obviously handy if you're okay with concrete and shuttering type jobs.
Obviously I have no dates yet, but we're keen to tap up some interested folk ready for when we do. So, if like me you have not got much work on and/or fancy a couple of days out, then let me know.
Post here, but ideally even if you do, drop me an email to the DCA address here https://www.thedca.org.uk/home/contacts as it is easier to coordinate jobs using one digital medium instead of email/PM/Facebook etc...
Ta
Pete Knight
DCA Projects Officer

Online T pot 2

  • obsessive maniac
  • ***
  • Posts: 403
Re: Capping some holes near Eldon Quarry - DCA Project
« Reply #1 on: July 11, 2020, 06:31:49 pm »
Are any of these on slitherstones?
If so is it possible to lid them?

Online Pete K

  • Pete Knight
  • forum hero
  • *****
  • Posts: 1604
  • DCA, PICA, TSG, DCRO, PDMHS, DCMC, YSS
    • Peak Instruction
Re: Capping some holes near Eldon Quarry - DCA Project
« Reply #2 on: July 11, 2020, 06:46:25 pm »
Yes, and yes, they are being lidded not sealed.

Offline alastairgott

  • forum hero
  • *****
  • Posts: 1855
Re: Capping some holes near Eldon Quarry - DCA Project
« Reply #3 on: July 11, 2020, 08:42:56 pm »
Count me in, if it's a weekend job then i'll be there. though I'm not sure of the next two weekends.

Online danthecavingman

  • forum star
  • ****
  • Posts: 694
  • Don't follow too close.....
Re: Capping some holes near Eldon Quarry - DCA Project
« Reply #4 on: July 11, 2020, 09:16:58 pm »
Sorry, this may be slightly off topic, but did anyone ever get down the shaft at Two Rakes Head with the big boulder on top of it? I'm sure it was just near the back of Eldon Quarry. One could see partway down the shaft to a stone arched level leading off. We tried to shift the boulder sometime back in the late nineties with no joy other than a squashed finger and a trip to Calow.....🥺
You see that Taxus baccata.........that's Yew that is........

Online Pete K

  • Pete Knight
  • forum hero
  • *****
  • Posts: 1604
  • DCA, PICA, TSG, DCRO, PDMHS, DCMC, YSS
    • Peak Instruction
Re: Capping some holes near Eldon Quarry - DCA Project
« Reply #5 on: July 20, 2020, 04:51:54 pm »
Moving ahead with the prep work for the holes up here. Concrete formers for both sites made up and flat-packed ready to go to site with about 1 tonne of concrete mixing supplies.
No start date as yet as we're still one signature away from SSSI permission. Fingers crossed for the coming weekend.

Offline pwhole

  • forum hero
  • *****
  • Posts: 1984
  • TSG, DCA, PDMHS
    • Phil Wolstenholme website
Re: Capping some holes near Eldon Quarry - DCA Project
« Reply #6 on: July 20, 2020, 05:05:32 pm »
Holey moley, that's amazing! ;)

Online Pete K

  • Pete Knight
  • forum hero
  • *****
  • Posts: 1604
  • DCA, PICA, TSG, DCRO, PDMHS, DCMC, YSS
    • Peak Instruction
Re: Capping some holes near Eldon Quarry - DCA Project
« Reply #7 on: July 20, 2020, 05:11:39 pm »
Still waiting for a bunch of weldmesh to be delivered to insert into the concrete, and I need to figure out how to remove the wood after the concrete goes off! I think it'll end up being mostly entombed. The second former is not quite a posh, being only a square of 4 planks for the shaft with ginging to surface.

Offline Jenny P

  • junky
  • ****
  • Posts: 790
Re: Capping some holes near Eldon Quarry - DCA Project
« Reply #8 on: July 20, 2020, 09:50:59 pm »
Holey moley, that's amazing! ;)

Pete only does "amazing" - anything less is just not good enough!

Offline pwhole

  • forum hero
  • *****
  • Posts: 1984
  • TSG, DCA, PDMHS
    • Phil Wolstenholme website
Re: Capping some holes near Eldon Quarry - DCA Project
« Reply #9 on: July 21, 2020, 07:31:05 pm »
Remember we used that fancy 'builder's greaseproof paper' up at Longcliffe - it didn't really stick to that? I think we may have oiled it first before we poured the concrete on. When we cast the shaft top cap we used oiled lino to make the inner circle, and it didn't stick to that either. I'll ask my friend who gave me the paper where he got it from - it may have been Jewson's.

Actually I think it was this, as it deffo had bitumen in the middle:

https://www.kitepackaging.co.uk/scp/papers/kraft-union-paper/?gclid=EAIaIQobChMIwqH_zP3e6gIVDevtCh23GwYsEAAYASAAEgLXxPD_BwE

Offline The Old Ruminator

  • forum hero
  • *****
  • Posts: 3517
Re: Capping some holes near Eldon Quarry - DCA Project
« Reply #10 on: July 22, 2020, 05:30:30 pm »
Oh. I had the other capping in mind before I read this. Best not mention my sort though.

Online Pete K

  • Pete Knight
  • forum hero
  • *****
  • Posts: 1604
  • DCA, PICA, TSG, DCRO, PDMHS, DCMC, YSS
    • Peak Instruction
Re: Capping some holes near Eldon Quarry - DCA Project
« Reply #11 on: July 28, 2020, 11:21:15 am »
Stand by for action! Permission imminent.

Online Pete K

  • Pete Knight
  • forum hero
  • *****
  • Posts: 1604
  • DCA, PICA, TSG, DCRO, PDMHS, DCMC, YSS
    • Peak Instruction
Re: Capping some holes near Eldon Quarry - DCA Project
« Reply #12 on: July 28, 2020, 02:02:31 pm »
Those who stated they were up for helping have been emailed. If you've not got it I missed you! Ping me a message and I'll forward it on.

Offline Ed

  • menacing presence
  • **
  • Posts: 200
Re: Capping some holes near Eldon Quarry - DCA Project
« Reply #13 on: July 28, 2020, 04:12:54 pm »
sealing not banging them.... :-\

Online Pete K

  • Pete Knight
  • forum hero
  • *****
  • Posts: 1604
  • DCA, PICA, TSG, DCRO, PDMHS, DCMC, YSS
    • Peak Instruction
Re: Capping some holes near Eldon Quarry - DCA Project
« Reply #14 on: July 28, 2020, 04:20:53 pm »
Lidding yes, not banging them!

Online Pete K

  • Pete Knight
  • forum hero
  • *****
  • Posts: 1604
  • DCA, PICA, TSG, DCRO, PDMHS, DCMC, YSS
    • Peak Instruction
Re: Capping some holes near Eldon Quarry - DCA Project
« Reply #15 on: July 29, 2020, 10:31:08 pm »
I have sudden and urgent need of either two or four lengths of 2m or so scaffolding. Does anyone know where I could pinch / buy / borrow some from? It'll be entombed but DCA will replace if needed.
Also, I need it Friday morning!

Offline pwhole

  • forum hero
  • *****
  • Posts: 1984
  • TSG, DCA, PDMHS
    • Phil Wolstenholme website
Re: Capping some holes near Eldon Quarry - DCA Project
« Reply #16 on: July 29, 2020, 11:07:32 pm »
Alan Medhurst did have plenty? It's not far to his ;)

Online nickwilliams

  • forum hero
  • *****
  • Posts: 1483
Re: Capping some holes near Eldon Quarry - DCA Project
« Reply #17 on: July 29, 2020, 11:14:02 pm »
In stock at Hucklow Digging Supplies, Pete.
"Economics is simply the branch of sociology that deals with people trading items and the fact that they use more numbers does not make it anymore of a science."

Online Pete K

  • Pete Knight
  • forum hero
  • *****
  • Posts: 1604
  • DCA, PICA, TSG, DCRO, PDMHS, DCMC, YSS
    • Peak Instruction
Re: Capping some holes near Eldon Quarry - DCA Project
« Reply #18 on: July 30, 2020, 06:16:13 am »
Thanks Nick, I think Roy's already in touch with you for me.

Online Pete K

  • Pete Knight
  • forum hero
  • *****
  • Posts: 1604
  • DCA, PICA, TSG, DCRO, PDMHS, DCMC, YSS
    • Peak Instruction
Re: Capping some holes near Eldon Quarry - DCA Project
« Reply #19 on: August 01, 2020, 05:15:43 pm »
Thanks to everyone who helped in the run up, with equipment and supplies, and working on the ground this last 2 days. I'll need to get some lids on when the concrete has set fully, but the main job is now done.
Pete K
DCA Projects Officer

Online T pot 2

  • obsessive maniac
  • ***
  • Posts: 403
Re: Capping some holes near Eldon Quarry - DCA Project
« Reply #20 on: August 01, 2020, 05:20:11 pm »
Well done Pete and team.

Offline Jenny P

  • junky
  • ****
  • Posts: 790
Re: Capping some holes near Eldon Quarry - DCA Project
« Reply #21 on: August 01, 2020, 06:17:48 pm »
Told you Pete and Co. only do amazing!

Offline Goydenman

  • Black Sheep Digger
  • junky
  • ****
  • Posts: 960
Re: Capping some holes near Eldon Quarry - DCA Project
« Reply #22 on: August 01, 2020, 07:51:34 pm »
great work well done

Offline pwhole

  • forum hero
  • *****
  • Posts: 1984
  • TSG, DCA, PDMHS
    • Phil Wolstenholme website
Re: Capping some holes near Eldon Quarry - DCA Project
« Reply #23 on: August 02, 2020, 12:02:53 am »
What a wonderful smooth finish - I was worried I'd left you in the lurch for today but it looks like there were plenty of staff in the end! Had Saturday's cast gone off by the time you got back? It hammered it down for ten mins here in the evening and I was worried it might be full of small craters by the morning!

Online Pete K

  • Pete Knight
  • forum hero
  • *****
  • Posts: 1604
  • DCA, PICA, TSG, DCRO, PDMHS, DCMC, YSS
    • Peak Instruction
Re: Capping some holes near Eldon Quarry - DCA Project
« Reply #24 on: August 02, 2020, 07:46:30 am »
Friday's concrete had gone off fine with a rustic textured feel to it. No cratering from rain and we were able to walk on it yesterday. Fingers crossed the tarp survived on the second hole long enough to keep the rain off. I'll pop back in a few days with the steel lids and we'll see.

 